Activities to be performed during final inspection are as below:
- Verifying Packing list comparing with P.O. sheet
- Determining of lot size
- Selecting of inspection severity level & sampling plan
- Preparation of Inspection
- Checking of carton
- Selection of carton
- Checking of Packing & packaging
- Selection of sample randomly (sample packing)
- Checking of garments Sample
- Checking of measurement (Dimension)
- Record and list all of the major or minor defects/defectives/non conformance's
- Tabulation and evaluation of results from this record
- Drawing of defective sample for reference
- Filling up of Carton (If samples are OK)
- Putting of Sticker & signature on carton
- Preparation of Report
- Conformation for the shipment
0 Comments