Ticker

20/recent/ticker-posts

Activities to be performed during final inspection are as below | ©AllaboutQMS

Activities to be performed during final inspection are as below: 


  1. Verifying Packing list comparing with P.O. sheet
  2. Determining of lot size
  3. Selecting of inspection severity level & sampling plan
  4. Preparation of Inspection
  5. Checking of carton
  6. Selection of carton
  7. Checking of Packing & packaging
  8. Selection of sample randomly (sample packing)
  9. Checking of garments Sample
  10. Checking of measurement (Dimension)
  11. Record and list all of the major or minor defects/defectives/non conformance's
  12. Tabulation and evaluation of results from this record
  13. Drawing of defective sample for reference
  14. Filling up of Carton (If samples are OK)
  15. Putting of Sticker & signature on carton
  16. Preparation of Report
  17. Conformation for the shipment

Post a Comment

0 Comments