Ticker

20/recent/ticker-posts

Top 100 Required Documents for Technical Audit | ©AllaboutQMS

Top 100 Required Documents for Technical Audit
  • Accessories inventory report.
  • All other QC checking report.
  • Any international certificate—ISO 9001-2015,SA-8000, WRAP.
  • Any rejection letter to supplier for Yarn / accessories & request for the replacement.
  • Assessment report on social/technical (Q.C checking report by your own QC) for the sub contractors if any- Embroidery, Printing, Washing.
  • Attendance record.
  • Broken needle policy.
  • Broken needle register.
  • Calibration report by metal detector machine ---how many times the machine is daily checked using 9 point system.
  • Customer satisfaction survey report.
  • Cut panel checking report/QC check report.
  • Daily production report.
  • Daily/last production report.
  • Environmental policy.
  • ETP maintenance record/PH test report for waste water.
  • Factory license, Trade license, Boiler license, Fire license.
  • Final inspection report.
  • Fire extinguisher maintenance registers.
  • Fit comments report.
  • Fusing machine temperature & pressure control register.
  • Goods pass by metal detector machine.
  • Health & safety policy.
  • In line inspection report.
  • In line test report of stud attaching machine.
  • Internal audit report.
  • Knitting panel check report/QC check report.
  • Laboratory test report for Yarn & accessories.
  • Laboratory test report for yarn / Yarn.
  • Last six months salary & overtime record.
  • List of hazardous chemical/MSDS.
  • List of machinery.
  • List of personal protective equipments with section wise.
  • Machine maintenance register.
  • Machine maintenance schedule/plan.
  • Machinery list with quantity.
  • Mechanical test report of stud attaching machine.
  • Metal detector checking report—how many pieces garments are daily checked by metal detector m/c.
  • Metal detector machine calibration report.
  • Needle issue register.
  • Order for accessories prepared by merchandiser.
  • Order for Yarn prepared by merchandiser.
  • Order plan for production
  • Organ gram with detailed job description/responsibility.
  • Organogram.
  • Pest control policy.
  • PPE list.
  • Pre-final inspection report by audit team along with QC manager.
  • Pre-production meting report.
  • Product specification report and Accidents register.
  • QC training record.
  • Quality manual.
  • Quality policy.
  • Recruitment policy.
  • Requisition for Yarn by cutting in charge.
  • Sample check report.
  • Sample room machine list.
  • Sharp tools policy.
  • Social audit report.
  • Stud attaching machine calibration report.
  • Sub-contractors assessment report.
  • Supplier assessment report.
  • Table inspection report.
  • Third party audit report.
  • TRAINING RECORD SPECIALLY FOR NEW EMPLOYEE ( AWARENESS PROGRAMME)
  • Used cutting blade keeping register.
  • Wastage disposal records/register.
  • Waste material disposal policy.
  • Work instruction report.
  • Work instruction to the relevant section/relevant person.
  • WR WC/WWC committee report/list of OR Grievance handling procedure.
  • Written authority of QC manager to stop production.
  • Yarn color continuity card/Blanket for color shade approval.
  • Yarn inspection report during laying of Yarn.
  • Yarn inspection report.
  • Yarn inventory report.
  • Yarn/yarn/accessories inventory/inspection report.
  • Zipper test report.

Post a Comment

0 Comments