Top 100 Required Documents for Technical Audit
- Accessories inventory report.
- All other QC checking report.
- Any international certificate—ISO 9001-2015,SA-8000, WRAP.
- Any rejection letter to supplier for Yarn / accessories & request for the replacement.
- Assessment report on social/technical (Q.C checking report by your own QC) for the sub contractors if any- Embroidery, Printing, Washing.
- Attendance record.
- Broken needle policy.
- Broken needle register.
- Calibration report by metal detector machine ---how many times the machine is daily checked using 9 point system.
- Customer satisfaction survey report.
- Cut panel checking report/QC check report.
- Daily production report.
- Daily/last production report.
- Environmental policy.
- ETP maintenance record/PH test report for waste water.
- Factory license, Trade license, Boiler license, Fire license.
- Final inspection report.
- Fire extinguisher maintenance registers.
- Fit comments report.
- Fusing machine temperature & pressure control register.
- Goods pass by metal detector machine.
- Health & safety policy.
- In line inspection report.
- In line test report of stud attaching machine.
- Internal audit report.
- Knitting panel check report/QC check report.
- Laboratory test report for Yarn & accessories.
- Laboratory test report for yarn / Yarn.
- Last six months salary & overtime record.
- List of hazardous chemical/MSDS.
- List of machinery.
- List of personal protective equipments with section wise.
- Machine maintenance register.
- Machine maintenance schedule/plan.
- Machinery list with quantity.
- Mechanical test report of stud attaching machine.
- Metal detector checking report—how many pieces garments are daily checked by metal detector m/c.
- Metal detector machine calibration report.
- Needle issue register.
- Order for accessories prepared by merchandiser.
- Order for Yarn prepared by merchandiser.
- Order plan for production
- Organ gram with detailed job description/responsibility.
- Organogram.
- Pest control policy.
- PPE list.
- Pre-final inspection report by audit team along with QC manager.
- Pre-production meting report.
- Product specification report and Accidents register.
- QC training record.
- Quality manual.
- Quality policy.
- Recruitment policy.
- Requisition for Yarn by cutting in charge.
- Sample check report.
- Sample room machine list.
- Sharp tools policy.
- Social audit report.
- Stud attaching machine calibration report.
- Sub-contractors assessment report.
- Supplier assessment report.
- Table inspection report.
- Third party audit report.
- TRAINING RECORD SPECIALLY FOR NEW EMPLOYEE ( AWARENESS PROGRAMME)
- Used cutting blade keeping register.
- Wastage disposal records/register.
- Waste material disposal policy.
- Work instruction report.
- Work instruction to the relevant section/relevant person.
- WR WC/WWC committee report/list of OR Grievance handling procedure.
- Written authority of QC manager to stop production.
- Yarn color continuity card/Blanket for color shade approval.
- Yarn inspection report during laying of Yarn.
- Yarn inspection report.
- Yarn inventory report.
- Yarn/yarn/accessories inventory/inspection report.
- Zipper test report.